The main stages
- 01
Prepare a dimensioned plan of paths, paved areas and lighting, with the intended use of each area.
- 02
Ask a specialist to assess the ground, drainage and existing utilities. These conditions affect the design.
- 03
Compare paving, kerbs, preparation and delivery against one specification. Site area alone is not enough to design the base.
This is a general planning guide from the BARLYK knowledge base. Work scope, technical decisions and material quantities depend on the actual site conditions.